Skip to content

The Nations

As of August 28, 2026

What isn't known yet

Every deal that has not closed, every term left undisclosed, every decision still pending. Gathered from the ledger and from the briefs, and kept until the record answers them.

253

questions open

15

restated in a later edition

224

days since the oldest was raised

85

from the ledger, 168 from the briefs

Why this exists

An announcement and a completed transaction read almost identically in a headline. What separates them is usually a question nobody has answered yet: what the terms were, who actually holds the equity, whether the financing closed, what a court will decide. Those questions get raised once when a story breaks and then disappear, which is how an announcement quietly becomes remembered as a fact.

This page keeps them. Anything restated in a later edition has been carried — the record went back to it and still had no answer — and those sort to the top.

The carried count is a floor, not a total. Questions are matched by their wording, and the brief tends to rephrase as a story develops, so the same underlying question asked three different ways counts as three. Treat a high carry count as a strong signal and a count of one as no signal either way.

The register

Showing 253 of 253 questions

  1. Carried 8× open 4 weeks · first raised Jul 28 Brief

    LNG Canada, Yellowhead Copper, Roberts Bank Terminal 2, Burrard Inlet dredging, Mount Polley, Namaygoosisagagun rebuild funding, Dumont Nickel, Cowichan Tribes title appeal and Senakw Tower Two occupancy remain unresolved from prior editions and manual checks.

    On: No ownership closing crossed the Wednesday tape; the useful signal was infrastructure intake, operating capacity and climate-adaptation cost.
  2. Carried 7× open 4 weeks · first raised Jul 29 Brief

    Tilbury LNG remains open after the Phase 2 public-comment close. The next material update would be a posted assessment step, final decision timeline or disclosed Musqueam equity structure.

    On: No ownership closing crossed the Wednesday tape; the useful signal was infrastructure intake, operating capacity and climate-adaptation cost.
  3. Carried 4× open 3 weeks · first raised Aug 5 Brief

    Crawford nickel remains pending until IAAC posts a decision statement with conditions, even if secondary reporting moves ahead of the registry.

    On: No ownership closing crossed the Wednesday tape; the useful signal was infrastructure intake, operating capacity and climate-adaptation cost.
  4. Carried 4× open 3 weeks · first raised Aug 7 Brief

    Ottawa has yet to respond to the August 6 coalition letter on renewing lapsing MMIWG2S+ program funding, with roughly half of Calls for Justice-linked initiatives at risk between 2026-27 and 2030-31.

    On: A table Canada has never set: First Nations leadership will sit across from the Prime Minister and every premier on October 26 — while BC's DRIPA fight reopens by petition and Ottawa settles $209.5 million in broken agricultural promises
  5. Carried 3× open 17 days · first raised Aug 11 Brief

    Okanagan Indian Band wildfire recovery remains active until damage totals, recovery funding, water status and service-restoration timelines are public; the August 12 APTN Syilx wildfire feature was Cloudflare-blocked in this run and was not used as a source.

    On: No ownership closing crossed the Wednesday tape; the useful signal was infrastructure intake, operating capacity and climate-adaptation cost.
  6. Carried 3× open 14 days · first raised Aug 14 Brief

    Bill C-21, the Red River Métis self-government treaty legislation, remains short of second reading with no fall sitting date confirmed and First Nations consultation concerns unresolved.

    On: A table Canada has never set: First Nations leadership will sit across from the Prime Minister and every premier on October 26 — while BC's DRIPA fight reopens by petition and Ottawa settles $209.5 million in broken agricultural promises
  7. Carried 3× open 14 days · first raised Aug 14 Brief

    The West Coast pipeline comment deadline, extended to September 18 amid wildfire disruption, still runs toward an October 1 national-interest listing decision — with the Major Projects Office consultation process publicly contested by UBCIC and Nation-side critics, and the first-ever First Nations–First Ministers' Meeting now set for three weeks after that decision date.

    On: A table Canada has never set: First Nations leadership will sit across from the Prime Minister and every premier on October 26 — while BC's DRIPA fight reopens by petition and Ottawa settles $209.5 million in broken agricultural promises
  8. Carried 3× open 3 days · first raised Aug 25 Brief

    MNBC certified result: carry until the OneFeather public result page or MNBC election site posts the count declaration and swearing-in details.

    On: Wednesday's signal was operating architecture: Tahltan land-use talks, Nation-owned energy capital, shale-gas consultation risk, shelter procurement and labour-market evidence.
  9. Carried 2× open 6 weeks · first raised Jul 17 Brief

    This edition's material developments are First Nations-specific. Inuit and Métis sources were scanned, but no Inuit or Métis economic item cleared the weekend materiality and verification bar.

    On: Ottawa named a port expansion as a national priority; Tsawwassen First Nation answered by naming the conditions.
  10. Carried 2× open 4 weeks · first raised Jul 29 Brief

    Ottawa's major-project reform file remains unresolved until the end-of-summer What We Heard report shows how rights-holder objections were recorded before legislation.

    On: No new Indigenous ownership closing crossed the tape; the live signal was litigation over failed infrastructure, coastal project boundaries, fiscal-governance standards and procurement gates.
  11. Carried 2× open 4 weeks · first raised Jul 29 Brief

    The Rural Development Action Plan is still a later-2026 catalyst; the open question is whether local-benefit and Indigenous-engagement themes become program rules.

    On: No new Indigenous ownership closing crossed the tape; the live signal was litigation over failed infrastructure, coastal project boundaries, fiscal-governance standards and procurement gates.
  12. Carried 2× open 11 days · first raised Aug 17 Brief

    Build Communities Strong Fund remains open as a selection-stage file after the Indigenous and territorial Direct Delivery deadline closed August 12; no Indigenous project shortlist was located in the Monday public record reviewed.

    On: No new ownership closing crossed Monday's tape; the signal was legal process, access to water, food-security procurement and B.C. mineral-tenure pressure.
  13. Carried 2× open 11 days · first raised Aug 17 Brief

    Tilbury LNG, Crawford nickel, LNG Canada Phase 2 / MNT, Ksi Lisims LNG, Roberts Bank Terminal 2, Cowichan Tribes title appeal, Baffinland / Mary River and B.C.'s First Nations Equity Financing Program remain unresolved from prior editions.

    On: No new ownership closing crossed Monday's tape; the signal was legal process, access to water, food-security procurement and B.C. mineral-tenure pressure.
  14. Carried 2× open 8 days · first raised Aug 20 Brief

    Ekati closure, Gitsegukla settlement-capital planning, Gitxaała / Declaration Act, Build Communities Strong Fund selection, Tilbury LNG, Crawford nickel, LNG Canada Phase 2 / MNT, Ksi Lisims LNG, Roberts Bank Terminal 2, Cowichan Tribes title appeal, Baffinland / Mary River and B.C.'s First Nations Equity Financing Program remain unresolved from prior editions.

    On: The weekend did not close a major Indigenous equity transaction; the signal was corridor feasibility, local enterprise, emergency capacity and jurisdiction.
  15. Carried 2× open 3 days · first raised Aug 25 Brief

    KSM substantial-start reconsideration, Gitxaała / Declaration Act, Build Communities Strong Fund selection, Tilbury LNG, Crawford nickel, LNG Canada Phase 2 / MNT, Ksi Lisims LNG, Roberts Bank Terminal 2, Cowichan Tribes title appeal, Baffinland / Mary River and the B.C. First Nations Equity Financing Program remain unresolved from prior editions.

    On: Tuesday moved from exposure to instruments: treaty compensation, signed project terms, hatchery contracts, Nation-led monitoring and distinct Métis tariff asks.
  16. open 32 weeks · first raised Jan 16 implementation Ledger

    How much new coverage will result, on what timetable, and with what capital stack?

    On: Canada announced an unused-spectrum licensing framework intended to improve rural, remote, and Indigenous connectivity.
  17. open 32 weeks · first raised Jan 16 implementation Ledger

    Which Indigenous applicants received licences?

    On: Canada announced an unused-spectrum licensing framework intended to improve rural, remote, and Indigenous connectivity.
  18. open 31 weeks · first raised Jan 26 permit or approval Ledger

    How will consent conditions and benefit commitments be monitored through operations?

    On: Skeena Gold + Silver's Eskay Creek project received a B.C. environmental assessment certificate, a federal impact-assessment decision, and a Mines Act permit with Tahltan consent.
  19. open 31 weeks · first raised Jan 26 permit or approval Ledger

    Will the project meet its construction schedule and budget?

    On: Skeena Gold + Silver's Eskay Creek project received a B.C. environmental assessment certificate, a federal impact-assessment decision, and a Mines Act permit with Tahltan consent.
  20. open 30 weeks · first raised Jan 27 transaction closed Ledger

    What debt and equity funded the acquisition?

    On: Wiikwemkoong Unceded Territory acquired Edmonton's Connect Centre for approximately $65 million.
  21. open 30 weeks · first raised Jan 27 transaction closed Ledger

    What return and governance thresholds does the Nation use for urban real estate?

    On: Wiikwemkoong Unceded Territory acquired Edmonton's Connect Centre for approximately $65 million.
  22. open 28 weeks · first raised Feb 12 legislation introduced Ledger

    What fiscal and implementation arrangements would follow enactment?

    On: Canada introduced Bill C-21 to give effect to the Red River Métis Self-Government Recognition and Implementation Treaty.
  23. open 28 weeks · first raised Feb 12 legislation introduced Ledger

    Will Parliament amend the bill to address First Nations concerns?

    On: Canada introduced Bill C-21 to give effect to the Red River Métis Self-Government Recognition and Implementation Treaty.
  24. open 27 weeks · first raised Feb 19 implementation Ledger

    What capital is committed and how quickly will access be acquired?

    On: Canada and five A-Tlegay member Nations signed a 20-year fisheries reconciliation agreement.
  25. open 27 weeks · first raised Feb 19 implementation Ledger

    What governance and distribution arrangements apply among the five Nations?

    On: Canada and five A-Tlegay member Nations signed a 20-year fisheries reconciliation agreement.
  26. open 27 weeks · first raised Feb 20 implementation Ledger

    What economic capacity and recurring funding accompany implementation?

    On: Musqueam Indian Band and Canada signed three agreements concerning rights recognition, stewardship, and fisheries.
  27. open 27 weeks · first raised Feb 20 implementation Ledger

    Which decisions move into shared or consent-based processes?

    On: Musqueam Indian Band and Canada signed three agreements concerning rights recognition, stewardship, and fisheries.
  28. open 26 weeks · first raised Feb 27 judgment Ledger

    What governance will protect intergenerational value while meeting current community priorities?

    On: Ontario Superior Court upheld the Crown's $3.6-billion compensation determination for the Robinson-Superior Treaty annuity breach.
  29. open 26 weeks · first raised Feb 27 judgment Ledger

    When and how will compensation be paid and allocated?

    On: Ontario Superior Court upheld the Crown's $3.6-billion compensation determination for the Robinson-Superior Treaty annuity breach.
  30. open 26 weeks · first raised Feb 28 proposal Ledger

    Has the partnership legally closed and begun operating?

    On: Kitsaki Management and March Consulting entered a definitive agreement to form a 51-per-cent Indigenous-owned engineering partnership.
  31. open 26 weeks · first raised Feb 28 proposal Ledger

    How are control, profit distribution, and technical capacity shared?

    On: Kitsaki Management and March Consulting entered a definitive agreement to form a 51-per-cent Indigenous-owned engineering partnership.
  32. open 25 weeks · first raised Mar 7 transaction closed Ledger

    How will the capital be governed and allocated across generations?

    On: Mississaugas of the Credit, Canada, and Ontario completed a $183.4-million Rouge River Valley Tract Claim settlement.
  33. open 25 weeks · first raised Mar 7 transaction closed Ledger

    Will the settlement seed operating assets or primarily fund community priorities?

    On: Mississaugas of the Credit, Canada, and Ontario completed a $183.4-million Rouge River Valley Tract Claim settlement.
  34. open 24 weeks · first raised Mar 10 financial close Ledger

    How will the five Nations govern their collective ownership vehicle?

    On: A federal Indigenous loan guarantee supported First Nation ownership in Hydro One's Chatham-to-Lakeshore transmission line.
  35. open 24 weeks · first raised Mar 10 financial close Ledger

    What are the acquisition price, debt terms, and forecast distributions?

    On: A federal Indigenous loan guarantee supported First Nation ownership in Hydro One's Chatham-to-Lakeshore transmission line.
  36. open 23 weeks · first raised Mar 17 transaction closed Ledger

    How is ownership separated from hotel management and brand obligations?

    On: Snuneymuxw First Nation acquired full ownership of the Courtyard by Marriott Nanaimo.
  37. open 23 weeks · first raised Mar 17 transaction closed Ledger

    What capital structure and return thresholds apply?

    On: Snuneymuxw First Nation acquired full ownership of the Courtyard by Marriott Nanaimo.
  38. open 23 weeks · first raised Mar 19 transaction closed Ledger

    What fisheries-supply and market advantages can the new owner create?

    On: Hardy Buoys Smoked Fish transitioned to Indigenous ownership in Port Hardy.
  39. open 23 weeks · first raised Mar 19 transaction closed Ledger

    Who ultimately owns and governs the acquisition vehicle?

    On: Hardy Buoys Smoked Fish transitioned to Indigenous ownership in Port Hardy.
  40. open 22 weeks · first raised Mar 26 financial close Ledger

    How concentrated are pledged revenues and borrower exposures?

    On: The First Nations Finance Authority placed a $485-million bond issue.
  41. open 22 weeks · first raised Mar 26 implementation Ledger

    How much reported spending produces verified Indigenous control, employment, and retained margin?

    On: The Procurement Ombud reported systemic integrity and accountability failures in federal Indigenous procurement.
  42. open 22 weeks · first raised Mar 26 legally effective Ledger

    What net recurring revenue remains after administration and changes to other tax-sharing arrangements?

    On: Bill C-15 received Royal Assent, creating the First Nations Goods and Services Tax Act framework.
  43. open 22 weeks · first raised Mar 26 legally effective Ledger

    Which First Nations will opt in and on what subset of products?

    On: Bill C-15 received Royal Assent, creating the First Nations Goods and Services Tax Act framework.
  44. open 22 weeks · first raised Mar 26 financial close Ledger

    Which uses of proceeds create recurring own-source revenue versus replace grant-funded infrastructure?

    On: The First Nations Finance Authority placed a $485-million bond issue.
  45. open 22 weeks · first raised Mar 26 implementation Ledger

    Will reforms protect legitimate joint ventures without enabling pass-through structures?

    On: The Procurement Ombud reported systemic integrity and accountability failures in federal Indigenous procurement.
  46. open 22 weeks · first raised Mar 30 implementation Ledger

    How will funding translate into local service capacity?

    On: The Canadian Human Rights Tribunal approved an $8.5-billion agreement to reform First Nations child and family services in Ontario.
  47. open 22 weeks · first raised Mar 30 implementation Ledger

    What precedential effect will the Ontario model have elsewhere?

    On: The Canadian Human Rights Tribunal approved an $8.5-billion agreement to reform First Nations child and family services in Ontario.
  48. open 21 weeks · first raised Apr 2 judgment Ledger

    How will existing tenures and land-use decisions be reconciled with the declaration?

    On: The B.C. Court of Appeal declared Nuchatlaht Aboriginal title over the full claim area of roughly 210 square kilometres on Nootka Island.
  49. open 21 weeks · first raised Apr 2 judgment Ledger

    What fiscal and governance arrangements will operationalize title?

    On: The B.C. Court of Appeal declared Nuchatlaht Aboriginal title over the full claim area of roughly 210 square kilometres on Nootka Island.
  50. open 20 weeks · first raised Apr 9 consultation Ledger

    How will affordability and long-term operations be measured?

    On: The CRTC opened a consultation on a new Indigenous stream of the Broadband Fund.
  51. open 20 weeks · first raised Apr 9 consultation Ledger

    Will the stream fund Indigenous ownership or only service to Indigenous communities?

    On: The CRTC opened a consultation on a new Indigenous stream of the Broadband Fund.
  52. open 19 weeks · first raised Apr 15 legislation introduced Ledger

    Can overlap concerns be resolved without reopening core treaty terms?

    On: B.C. introduced the Kitselas Treaty Act, then deferred further passage to the fall amid neighbouring-Nation concerns.
  53. open 19 weeks · first raised Apr 15 legislation introduced Ledger

    What legal and economic certainty will exist if implementation proceeds amid continued objections?

    On: B.C. introduced the Kitselas Treaty Act, then deferred further passage to the fall amid neighbouring-Nation concerns.
  54. open 18 weeks · first raised Apr 24 implementation Ledger

    How much funding is incremental and contractually committed?

    On: Canada reconfigured the $4-billion urban, rural, and northern Indigenous housing commitment around Build Canada Homes and distinctions-based agreements.
  55. open 18 weeks · first raised Apr 24 implementation Ledger

    Who controls allocation decisions for urban Indigenous housing?

    On: Canada reconfigured the $4-billion urban, rural, and northern Indigenous housing commitment around Build Canada Homes and distinctions-based agreements.
  56. open 17 weeks · first raised May 1 implementation Ledger

    How is funding allocated among Nations and years?

    On: B.C. signed $283 million of 10-year restoration agreements with seven Treaty 8 First Nations.
  57. open 17 weeks · first raised May 1 implementation Ledger

    Which outcomes will be independently measured, and who controls data and procurement?

    On: B.C. signed $283 million of 10-year restoration agreements with seven Treaty 8 First Nations.
  58. open 17 weeks · first raised May 4 implementation Ledger

    What measures can demonstrate fiscal autonomy without recreating punitive reporting?

    On: The Auditor General found that Indigenous Services Canada had not demonstrated whether new fiscal initiatives with First Nations were improving outcomes.
  59. open 17 weeks · first raised May 4 implementation Ledger

    Will capacity funding match the responsibilities transferred?

    On: The Auditor General found that Indigenous Services Canada had not demonstrated whether new fiscal initiatives with First Nations were improving outcomes.
  60. open 16 weeks · first raised May 7 MOU Ledger

    How will corridor Nations be engaged before route and land decisions harden?

    On: NACCA and Alto signed an MOU to connect Indigenous businesses, entrepreneurs, workers, and Indigenous Financial Institutions to Canada's proposed high-speed rail network.
  61. open 16 weeks · first raised May 7 MOU Ledger

    Will Indigenous participation include ownership and decision rights or remain focused on procurement and workforce?

    On: NACCA and Alto signed an MOU to connect Indigenous businesses, entrepreneurs, workers, and Indigenous Financial Institutions to Canada's proposed high-speed rail network.
  62. open 15 weeks · first raised May 15 restructuring Ledger

    What liabilities, expansion plans, and environmental obligations transfer in a restructuring?

    On: Baffinland Iron Mines entered CCAA creditor protection while continuing Mary River operations.
  63. open 15 weeks · first raised May 15 restructuring Ledger

    Will a buyer or recapitalization preserve operations and honour Inuit agreements?

    On: Baffinland Iron Mines entered CCAA creditor protection while continuing Mary River operations.
  64. open 14 weeks · first raised May 21 litigation Ledger

    How will mineral-claim consultation operate while the appeal is pending?

    On: The Supreme Court of Canada granted leave in British Columbia's appeal of Gitxaala, putting the legal effect of B.C.'s Declaration Act before the Court.
  65. open 14 weeks · first raised May 21 litigation Ledger

    Will the Court treat UNDRIP consistency as an immediately enforceable constraint?

    On: The Supreme Court of Canada granted leave in British Columbia's appeal of Gitxaala, putting the legal effect of B.C.'s Declaration Act before the Court.
  66. open 14 weeks · first raised May 22 proposal Ledger

    How will conservation objectives interact with fisheries, shipping, tourism, and local economic use?

    On: Six First Nations and Canada announced a collaborative framework for the proposed Mia-yaltwa Ha'lidzogm hoon marine conservation area on B.C.'s central coast.
  67. open 14 weeks · first raised May 22 proposal Ledger

    What powers and funding will sit with each Nation?

    On: Six First Nations and Canada announced a collaborative framework for the proposed Mia-yaltwa Ha'lidzogm hoon marine conservation area on B.C.'s central coast.
  68. open 13 weeks · first raised May 28 litigation Ledger

    How will damages be assessed if title is proven?

    On: The Supreme Court of Canada declined leave in the Wolastoqey private-land title appeal.
  69. open 13 weeks · first raised May 28 provincial ratification Ledger

    How will land, taxation, fisheries, and overlapping-interest implementation work in practice?

    On: British Columbia's K’ómoks First Nation Treaty Act received Royal Assent.
  70. open 13 weeks · first raised May 28 litigation Ledger

    How will other appellate courts address title and private interests on different pleadings and records?

    On: The Supreme Court of Canada declined leave in the Wolastoqey private-land title appeal.
  71. open 13 weeks · first raised May 28 provincial ratification Ledger

    When will federal ratification occur?

    On: British Columbia's K’ómoks First Nation Treaty Act received Royal Assent.
  72. open 13 weeks · first raised May 29 financial close Ledger

    How will the six Nations govern reserves and distributions?

    On: Six First Nations increased their collective ownership in the East-West Tie transmission line from 3.5 per cent to 20 per cent.
  73. open 13 weeks · first raised May 29 financial close Ledger

    What acquisition valuation and financing terms apply?

    On: Six First Nations increased their collective ownership in the East-West Tie transmission line from 3.5 per cent to 20 per cent.
  74. open 12 weeks · first raised Jun 4 financial close Ledger

    How much new issuance funds revenue-producing assets?

    On: FNFA completed a record $800-million bond issue, bringing cumulative issuance above $5 billion.
  75. open 12 weeks · first raised Jun 4 financial close Ledger

    Will the proposed SPV reform expand project-finance access without weakening the pooled-credit model?

    On: FNFA completed a record $800-million bond issue, bringing cumulative issuance above $5 billion.
  76. open 12 weeks · first raised Jun 5 proposal Ledger

    How will exploration funding be raised without unacceptable dilution or guarantees?

    On: Solid Gold Resources announced an arrangement with Apitipi Anicinapek Nation to launch a majority Indigenous-led junior mining company.
  77. open 12 weeks · first raised Jun 5 proposal Ledger

    What fully diluted ownership and control will the Nation hold?

    On: Solid Gold Resources announced an arrangement with Apitipi Anicinapek Nation to launch a majority Indigenous-led junior mining company.
  78. open 12 weeks · first raised Jun 8 judgment Ledger

    Can the Province cure consultation without altering the substantive outcome?

    On: B.C. Supreme Court quashed the KSM project's substantially-started determination because consultation with Tsetsaut Skii km Lax Ha had been inadequate.
  79. open 12 weeks · first raised Jun 8 judgment Ledger

    What costs and schedule consequences arise for KSM and affected Nations?

    On: B.C. Supreme Court quashed the KSM project's substantially-started determination because consultation with Tsetsaut Skii km Lax Ha had been inadequate.
  80. open 11 weeks · first raised Jun 9 proposal Ledger

    What cash equity, debt, guarantees, distributions, and downside protections apply to the Nisga'a interest?

    On: Ksi Lisims LNG announced benefit agreements with Lax Kw'alaams, Gitxaała, and Metlakatla, and two Nations withdrew federal court challenges.
  81. open 11 weeks · first raised Jun 9 proposal Ledger

    Who bears cost overruns and pipeline risk?

    On: Ksi Lisims LNG announced benefit agreements with Lax Kw'alaams, Gitxaała, and Metlakatla, and two Nations withdrew federal court challenges.
  82. open 11 weeks · first raised Jun 15 financial close Ledger

    What construction-completion and downside protections apply to the Indigenous equity loan?

    On: Rose Valley Wind reached financial close with $164.4 million of Canada Infrastructure Bank financing and majority ownership by a 10-First-Nation development corporation.
  83. open 11 weeks · first raised Jun 15 financial close Ledger

    What percentage and economics sit with M-Squared after all financing?

    On: Rose Valley Wind reached financial close with $164.4 million of Canada Infrastructure Bank financing and majority ownership by a 10-First-Nation development corporation.
  84. open 10 weeks · first raised Jun 16 transaction closed Ledger

    How will the partners govern operating, social, and reputational risk?

    On: Snuneymuxw and Musqueam completed the acquisition of River Rock Casino Resort through a Snuneymuxw-majority partnership.
  85. open 10 weeks · first raised Jun 16 transaction closed Ledger

    What purchase price, leverage, and distribution policy apply?

    On: Snuneymuxw and Musqueam completed the acquisition of River Rock Casino Resort through a Snuneymuxw-majority partnership.
  86. open 10 weeks · first raised Jun 16 implementation Ledger

    Which projects will qualify and how will the Province disclose contingent liabilities?

    On: British Columbia opened its $1-billion First Nations Equity Financing Program.
  87. open 10 weeks · first raised Jun 16 implementation Ledger

    Will smaller Nations have the advisory capacity to participate on equal terms?

    On: British Columbia opened its $1-billion First Nations Equity Financing Program.
  88. open 10 weeks · first raised Jun 22 financing committed Ledger

    What is the full capital stack and asset ownership?

    On: Canada committed $21.6 million to a clean-energy project led by Sayisi Dene First Nation in Manitoba.
  89. open 10 weeks · first raised Jun 22 financing committed Ledger

    Who bears operating and maintenance risk after commissioning?

    On: Canada committed $21.6 million to a clean-energy project led by Sayisi Dene First Nation in Manitoba.
  90. open 9 weeks · first raised Jun 23 financial close Ledger

    What exact equity percentage and valuation will the Nations receive?

    On: Canada and Ontario announced approximately $715 million of financing and guarantees to support seven Williams Treaties First Nations in the Darlington New Nuclear Project.
  91. open 9 weeks · first raised Jun 23 financial close Ledger

    Who bears cost overruns, delays, and decommissioning exposure?

    On: Canada and Ontario announced approximately $715 million of financing and guarantees to support seven Williams Treaties First Nations in the Darlington New Nuclear Project.
  92. open 9 weeks · first raised Jun 24 proposal Ledger

    What committed mine traffic underwrites the road and port?

    On: Canada advanced the Inuit-owned Grays Bay Road and Port project through major-project review and conditional preconstruction support.
  93. open 9 weeks · first raised Jun 24 proposal Ledger

    What is the full capital cost and long-term operating subsidy or revenue model?

    On: Canada advanced the Inuit-owned Grays Bay Road and Port project through major-project review and conditional preconstruction support.
  94. open 8 weeks · first raised Jul 2 proposal Ledger

    What economics support the project after construction, marine, climate, and legal risk?

    On: Canada and Alberta advanced a proposed one-million-barrel-per-day oil pipeline to B.C.'s south coast, with a possible Indigenous equity component.
  95. open 8 weeks · first raised Jul 2 proposal Ledger

    Which Nations would consent, oppose, or seek ownership, and on what route?

    On: Canada and Alberta advanced a proposed one-million-barrel-per-day oil pipeline to B.C.'s south coast, with a possible Indigenous equity component.
  96. open 8 weeks · first raised Jul 2 proposal Ledger

    Who is the legal and financial proponent?

    On: Canada and Alberta advanced a proposed one-million-barrel-per-day oil pipeline to B.C.'s south coast, with a possible Indigenous equity component.
  97. open 8 weeks · first raised Jul 6 consultation Ledger

    Which existing interests are affected and how?

    On: B.C. and First Nations advanced three conservation-planning areas covering about 127,000 hectares with a three-year mineral-tenure pause.
  98. open 8 weeks · first raised Jul 6 consultation Ledger

    Will final plans include durable Nation governance and revenue mechanisms?

    On: B.C. and First Nations advanced three conservation-planning areas covering about 127,000 hectares with a three-year mineral-tenure pause.
  99. open 6 weeks · first raised Jul 14 option Ledger

    How will the five partners allocate equity, governance, debt, and distributions?

    On: Five B.C. First Nation development organizations secured an option for up to a $1-billion majority interest in LNG Canada Phase 2 storage infrastructure.
  100. open 6 weeks · first raised Jul 14 option Ledger

    What return, lease term, guarantees, and residual-value exposure would MNT assume?

    On: Five B.C. First Nation development organizations secured an option for up to a $1-billion majority interest in LNG Canada Phase 2 storage infrastructure.
  101. open 6 weeks · first raised Jul 15 Brief

    LNG Canada's Phase 2 final investment decision, targeted by the end of 2026 — the condition on which the five Nations' $1-billion equity option turns.

    On: Fire in the northwest, resolve in Ottawa, and ownership at a scale not seen before
  102. open 6 weeks · first raised Jul 15 Brief

    The Federal Court of Appeal's decision on the Shamattawa drinking-water ruling, with Bill C-37 advancing in parallel and its 'progressive realization' language under scrutiny.

    On: Fire in the northwest, resolve in Ottawa, and ownership at a scale not seen before
  103. open 6 weeks · first raised Jul 15 Brief

    The Ministry of Natural Resources' aerial assessment of Namaygoosisagagun First Nation, and what follows the AFN's July 16 resolution on rebuild commitments — the Nation's federal recognition is still in process, which complicates its access to emergency support.

    On: Fire in the northwest, resolve in Ottawa, and ownership at a scale not seen before
  104. open 6 weeks · first raised Jul 15 Brief

    The October 26 first ministers meeting — the first test of the AFN's new mandate on fast-tracking, with Confederation, the Canada–Alberta pipeline agreement and federal legislation all on the requested agenda.

    On: Fire in the northwest, resolve in Ottawa, and ownership at a scale not seen before
  105. open 6 weeks · first raised Jul 16 Brief

    Court schedules, permit-amendment timing, and the fall engagement process for the proposed conservation areas.

    On: No fresh B.C. transaction cleared the 24-hour bar; live project-risk files stay on the ledger
  106. open 6 weeks · first raised Jul 16 Brief

    Mount Polley remains active because B.C. approved a higher tailings dam while Xat'sull First Nation concerns and appeal language remain unresolved.

    On: The live economic question is not whether major projects move. It is who has authority to say yes, no, or not yet.
  107. open 6 weeks · first raised Jul 16 Brief

    The proposed Qat'muk, Skagit Headwaters and Raush Valley conservation areas move next to detailed planning and fall engagement.

    On: The live economic question is not whether major projects move. It is who has authority to say yes, no, or not yet.
  108. open 6 weeks · first raised Jul 16 Brief

    The Tribunal timetable and whether Canada will voluntarily align with the First Nations-led plan.

    On: Child-welfare reform is becoming a fiscal-design fight
  109. open 6 weeks · first raised Jul 16 Brief

    The unverified LNG Canada storage-tank equity item surfaced through an aggregator but was not included because no accessible primary or independent source could be confirmed during this run.

    On: The live economic question is not whether major projects move. It is who has authority to say yes, no, or not yet.
  110. open 6 weeks · first raised Jul 16 Brief

    This morning's verified developments are First Nations-specific. No Inuit or Métis economic item cleared the materiality and verification bar in the scanned window.

    On: The live economic question is not whether major projects move. It is who has authority to say yes, no, or not yet.
  111. open 6 weeks · first raised Jul 16 Brief

    Tsleil-Waututh Nation's Burrard Inlet dredging challenge remains a live B.C. port-capacity and consultation file.

    On: The live economic question is not whether major projects move. It is who has authority to say yes, no, or not yet.
  112. open 6 weeks · first raised Jul 16 Brief

    Whether federal timelines will be adjusted when affected Nations need more time, funding or information.

    On: Chiefs draw a boundary around the AFN's role in major-project talks
  113. open 6 weeks · first raised Jul 16 Brief

    Whether ministers will offer process changes, money, timelines or only political assurances.

    On: Federal ministers face chiefs after the major-projects vote
  114. open 6 weeks · first raised Jul 16 Brief

    Whether the government will amend the bill before committee and how any final law will be funded.

    On: Clean-water legislation remains an infrastructure and rights test
  115. open 6 weeks · first raised Jul 16 Brief

    Which projects Ottawa will put first through the Major Projects Office.

    On: Chiefs draw a boundary around the AFN's role in major-project talks
  116. open 6 weeks · first raised Jul 16 Brief

    Who will attend the October First Ministers meeting on behalf of First Nations, and how that delegation will be chosen.

    On: Chiefs draw a boundary around the AFN's role in major-project talks
  117. open 6 weeks · first raised Jul 17 Brief

    Court schedules, permit-amendment timing and fall conservation engagement remain outstanding.

    On: B.C. produced two fresh agreements; the older project-risk files did not materially move
  118. open 6 weeks · first raised Jul 17 Brief

    Friday's long-form rotation found no new Tier E research strong enough to justify a Long Current section.

    On: Yesterday's national argument over consent now has a B.C. project file attached to it.
  119. open 6 weeks · first raised Jul 17 Brief

    The agreement does not settle whether Simpcw will consent to the mine.

    On: B.C. and Simpcw turn consent into the operating question for Yellowhead
  120. open 6 weeks · first raised Jul 17 Brief

    The assessment still has to define information requirements, technical-review scope and final decision timing.

    On: B.C. and Simpcw turn consent into the operating question for Yellowhead
  121. open 6 weeks · first raised Jul 17 Brief

    The federal clean-water and child-welfare files remain fiscal-design questions after the AFN assembly, but no new public document materially changed either file today.

    On: Yesterday's national argument over consent now has a B.C. project file attached to it.
  122. open 6 weeks · first raised Jul 17 Brief

    The final public resolution package was not yet posted during the scan, and Ottawa has not named the first tranche of Major Projects Office files.

    On: Ministers leave the AFN with the major-project question unresolved
  123. open 6 weeks · first raised Jul 17 Brief

    The LNG Canada Phase 2 storage-tank equity option remains a real but unresolved transaction file; it was not repeated because no new financing, final-investment-decision or lease-economics disclosure appeared in today's window.

    On: Yesterday's national argument over consent now has a B.C. project file attached to it.
  124. open 6 weeks · first raised Jul 17 Brief

    The public release does not provide store economics, revenue expectations or the exact operating conditions under the agreement.

    On: Gitanmaax Band gets a cannabis-sector agreement with B.C.
  125. open 6 weeks · first raised Jul 17 Brief

    The release does not disclose benefit, revenue-sharing, procurement or equity terms.

    On: B.C. and Simpcw turn consent into the operating question for Yellowhead
  126. open 6 weeks · first raised Jul 17 Brief

    Whether Canada will recognize Namaygoosisagagun's emergency needs directly, and what rebuild funding will be available if the community remains administratively tied to Collins First Nation.

    On: Wildfire response turns into a fiscal-capacity file for northern First Nations
  127. open 6 weeks · first raised Jul 20 Brief

    Court schedules, permit steps, agreement implementation and Major Projects Office process details remain outstanding.

    On: B.C.'s fresh signal is RBT2; older project-risk files stayed open
  128. open 6 weeks · first raised Jul 20 Brief

    First Peoples Law's July 8-14 report remained the latest visible legal roundup during the scan; no new court decision was elevated into today's brief.

    On: Ottawa named a port expansion as a national priority; Tsawwassen First Nation answered by naming the conditions.
  129. open 6 weeks · first raised Jul 20 Brief

    It remains unclear how Ottawa will reconcile export-speed targets with the conditions named by Tsawwassen First Nation and other affected rights holders.

    On: Roberts Bank enters the fast-track conversation, with Tsawwassen setting conditions
  130. open 6 weeks · first raised Jul 20 Brief

    No formal separation referendum has been called, and the final AFN resolution package was not visible during today's scan.

    On: Treaty No. 6 and Quebec First Nations push Alberta separation into the rights-risk ledger
  131. open 6 weeks · first raised Jul 20 Brief

    The federal clean-water and child-welfare fiscal-design files remain open after the AFN assembly, but no new public document materially changed either file over the weekend.

    On: Ottawa named a port expansion as a national priority; Tsawwassen First Nation answered by naming the conditions.
  132. open 6 weeks · first raised Jul 20 Brief

    The federal release does not say when the Major Projects Office review will finish or whether the project will be put on any formal fast-track list.

    On: Roberts Bank enters the fast-track conversation, with Tsawwassen setting conditions
  133. open 6 weeks · first raised Jul 20 Brief

    The LNG Canada Phase 2 storage-tank equity option remains unresolved; no new financing, final-investment-decision or lease-economics disclosure appeared in today's scan.

    On: Ottawa named a port expansion as a national priority; Tsawwassen First Nation answered by naming the conditions.
  134. open 6 weeks · first raised Jul 20 Brief

    The public record does not yet settle rebuild funding for Namaygoosisagagun, the division of federal-provincial costs, or whether local alert authority will be matched by communications infrastructure in the highest-risk communities.

    On: Ontario wildfire response becomes an emergency-infrastructure file
  135. open 6 weeks · first raised Jul 20 Brief

    The public reporting does not identify a B.C. host project, ownership proposal, regulatory path or participating Nations' final positions.

    On: B.C. First Nations are looking at nuclear, but the model is still Ontario's
  136. open 6 weeks · first raised Jul 20 Brief

    Tsawwassen First Nation's response does not disclose the economics of its agreements with the port authority or Global Container Terminals.

    On: Roberts Bank enters the fast-track conversation, with Tsawwassen setting conditions
  137. open 5 weeks · first raised Jul 24 Brief

    The Cowichan Tribes Aboriginal title case, now facing appeals from the Crown, the City of Richmond, Cowichan Tribes and a private landowner -- all converging toward a likely Supreme Court test of Aboriginal title versus fee-simple land.

    On: A wildfire erases a fly-in community as chiefs draw a national line on fast-tracked projects
  138. open 5 weeks · first raised Jul 24 Brief

    The mental-health toll on First Nations wildfire evacuees sheltering for weeks in Thunder Bay, Mississauga and Niagara Falls, against a 44 percent cut to Ontario's planned firefighting budget.

    On: A wildfire erases a fly-in community as chiefs draw a national line on fast-tracked projects
  139. open 5 weeks · first raised Jul 24 Brief

    Whether Ottawa moves to criminalize residential-school denialism through Bill C-9 or standalone legislation, after the Senate rejected an amendment that had passed its own Human Rights Committee.

    On: A wildfire erases a fly-in community as chiefs draw a national line on fast-tracked projects
  140. open 5 weeks · first raised Jul 24 Brief

    Whether Ottawa's support for Namaygoosisagagun turns into an actual rebuilding commitment, and whether the October 26 First Ministers Meeting addresses fast-tracked major projects on First Nations' terms.

    On: A wildfire erases a fly-in community as chiefs draw a national line on fast-tracked projects
  141. open 5 weeks · first raised Jul 27 Brief

    B.C. project-risk files from prior editions remain open: Yellowhead Copper consent-based assessment, Burrard Inlet dredging, Mount Polley, RBT2/Tsawwassen, and now Tilbury/LNG Canada assessment steps.

    On: B.C. moved an LNG file through a faster lane while Ottawa and Alberta showed how much the rights process still matters.
  142. open 5 weeks · first raised Jul 27 Brief

    It is not yet clear whether comments filed by affected Nations, local governments, or community groups will materially change the final Phase 2 assessment package.

    On: B.C. clears Tilbury's first expansion lane, with Musqueam ownership in the frame
  143. open 5 weeks · first raised Jul 27 Brief

    Namaygoosisagagun First Nation remains an emergency-infrastructure and rebuild-funding file. The weekend did not produce a public rebuilding commitment strong enough to update the July 24 weekly lead.

    On: B.C. moved an LNG file through a faster lane while Ottawa and Alberta showed how much the rights process still matters.
  144. open 5 weeks · first raised Jul 27 Brief

    No new Inuit or Métis economic item cleared both the weekend materiality bar and verification standard. Inuit-owned Arctic Fresh and the Métis Nation-Saskatchewan self-government treaty milestone were covered in the July 24 weekly edition and had no material weekend update.

    On: B.C. moved an LNG file through a faster lane while Ottawa and Alberta showed how much the rights process still matters.
  145. open 5 weeks · first raised Jul 27 Brief

    Phase 1B still requires applicable permits, and Phase 2 remains inside the environmental assessment process.

    On: B.C. clears Tilbury's first expansion lane, with Musqueam ownership in the frame
  146. open 5 weeks · first raised Jul 27 Brief

    The amendment application documents need to be reviewed for any Nation-specific comments, conditions, or marine-use concerns, and the equity option still depends on a Phase 2 final investment decision.

    On: The LNG Canada equity option picked up an amendment file
  147. open 5 weeks · first raised Jul 27 Brief

    The appeal outcome is unresolved, and the province's October 19 referendum question is separate from the citizen petition process.

    On: Alberta's separation petition cleared a count, but not the treaty-rights case
  148. open 5 weeks · first raised Jul 27 Brief

    The Cowichan Tribes Aboriginal title appeal path, Shamattawa drinking-water appeal, Attawapiskat contamination claim, and residential-school denialism legislation remain open from the weekly edition, with no new weekend filing found in this scan.

    On: B.C. moved an LNG file through a faster lane while Ottawa and Alberta showed how much the rights process still matters.
  149. open 5 weeks · first raised Jul 27 Brief

    The Nova Scotia release does not break out project economics by community, and the Montana public record does not yet settle final operating revenue, storage commissioning, or long-term power-market exposure.

    On: Clean-energy ownership moved from promise to operating ground in Nova Scotia and Alberta
  150. open 5 weeks · first raised Jul 27 Brief

    The public record does not yet disclose final Musqueam equity terms, financing structure, voting rights, or timing.

    On: B.C. clears Tilbury's first expansion lane, with Musqueam ownership in the frame
  151. open 5 weeks · first raised Jul 27 Brief

    The submissions are not yet public in a complete package, and the government has not said how Indigenous submissions will be distinguished from general stakeholder feedback.

    On: Ottawa's major-project review file now has a consultation count
  152. open 4 weeks · first raised Jul 28 Brief

    Dumont Nickel was selected for Quebec's Filon strategic-mining support on July 27, but the company release did not name affected Indigenous Nations or consultation outcomes. It stays on the watchlist rather than becoming an Indigenous economic item.

    On: A quiet tape still had one clear signal: Ottawa's next economic programs are being pushed toward local control, capacity and consent.
  153. open 4 weeks · first raised Jul 28 Brief

    It is not yet clear which programs will change, how funding will be allocated, or whether local-benefit tests will become enforceable conditions.

    On: Ottawa's rural plan now has a local-benefit test
  154. open 4 weeks · first raised Jul 28 Brief

    The Alberta separation file remains live after the July 24 petition validation; the appeal and Treaty-rights litigation path are still the real catalysts.

    On: A quiet tape still had one clear signal: Ottawa's next economic programs are being pushed toward local control, capacity and consent.
  155. open 4 weeks · first raised Jul 28 Brief

    The Confederacy's full submission was not separately found in this run, and Ottawa has not yet published the engagement summary or draft legislation.

    On: Treaty No. 6 puts the fast-track project model back on rights-holder terms
  156. open 4 weeks · first raised Jul 28 Brief

    The government has not yet published the full Rural Development Action Plan or a detailed distinctions-based summary of Indigenous input.

    On: Ottawa's rural plan now has a local-benefit test
  157. open 4 weeks · first raised Jul 28 Brief

    The public release does not state whether any First Nation communities were receiving evacuees through this centre or whether additional emergency-management funding will follow.

    On: Pear Lake evacuations tested the local emergency-support lane
  158. open 4 weeks · first raised Jul 28 Brief

    The release does not name the participating First Nations, employers, credential path, placement commitments or whether graduates will move into Nation-led projects.

    On: Treaty #3 workforce training gets a tariff-response allocation
  159. open 4 weeks · first raised Jul 28 Brief

    Tilbury LNG remains open after the public-comment close. The next material update would be a posted assessment step, final decision timeline or disclosed Musqueam equity structure.

    On: A quiet tape still had one clear signal: Ottawa's next economic programs are being pushed toward local control, capacity and consent.
  160. open 4 weeks · first raised Jul 29 Brief

    It is not yet clear how First Nations and Metis CFS authorities will shape the review beyond participation, or whether interim funding changes will happen before the year-long review is complete.

    On: Manitoba is reopening the fiscal machinery under child welfare jurisdiction
  161. open 4 weeks · first raised Jul 29 Brief

    The Daily release is a high-level entry point; program-level decisions on funding formulas, evacuation supports and infrastructure standards have not yet followed from the data.

    On: Statistics Canada turns wildfire disruption into measurable public-policy evidence
  162. open 4 weeks · first raised Jul 29 Brief

    The external consultant has not been selected, the detailed terms of reference are not public, and the province has not said which funding formula changes are on the table.

    On: Manitoba is reopening the fiscal machinery under child welfare jurisdiction
  163. open 4 weeks · first raised Jul 29 Brief

    The hire has not been made, the full community-liaison protocol is not public, and an Indigenous-led inquiry into systemic racism in New Brunswick remains a separate unresolved file.

    On: Atlantic police oversight adds a funded Indigenous liaison and investigation role
  164. open 4 weeks · first raised Jul 29 Brief

    The public pages do not provide a consolidated cost estimate, member-displacement count by Nation, or a clear line between provincial, regional and First Nation incremental costs.

    On: B.C.'s active wildfire map keeps First Nation emergency authority on the daily ledger
  165. open 4 weeks · first raised Jul 30 Brief

    A public copy of the statement of claim was not found during this run, so the detailed allegations are carried as reported by APTN rather than independently read from the court file.

    On: Pimicikamak moves the outage file from emergency response to litigation
  166. open 4 weeks · first raised Jul 30 Brief

    No First Nation ownership structure, procurement set-aside, benefit agreement or named Nation partnership was disclosed in the public release.

    On: B.C. Hydro reaches supplier-qualification day for Vancouver Island battery storage
  167. open 4 weeks · first raised Jul 30 Brief

    The claim has not been certified, no defence has been filed publicly, and the size of any repair, replacement or compensation exposure remains unresolved.

    On: Pimicikamak moves the outage file from emergency response to litigation
  168. open 4 weeks · first raised Jul 30 Brief

    The final amendments, comment timeline and any transition rules were not visible on the fetched public page.

    On: FMB puts First Nations finance standards back under review
  169. open 4 weeks · first raised Jul 30 Brief

    The July 29 release is a reaffirmation, not a new legal instrument. The implementation committee decisions, pipeline route, First Nations consultation, equity terms, liability fund mechanics and whether the commitments become binding instruments remain undisclosed.

    On: B.C. and coastal First Nations reaffirm the tanker-ban boundary around North Coast growth
  170. open 4 weeks · first raised Jul 30 Brief

    The public notice does not disclose an Indigenous procurement target, set-aside, evaluation weight or list of potential Indigenous suppliers.

    On: Ottawa's defence-drone supplier lane includes Indigenous businesses, but no target yet
  171. open 3 weeks · first raised Aug 4 Brief

    Crawford nickel should be treated as pending until the ministerial decision statement is public, even if secondary reporting moves ahead of the registry.

    On: No new Indigenous ownership closing crossed the public tape; the live signal was operating capacity around finance standards, procurement access, land-use planning and critical-mineral approval clocks.
  172. open 3 weeks · first raised Aug 4 Brief

    No public decision statement approving the project was verified during the run. The conversion mechanics for Taykwa Tagamou Nation's note, the final conditions and any additional Indigenous equity or benefit terms remain unresolved.

    On: Crawford nickel remains a decision-clock file, not a verified approval
  173. open 3 weeks · first raised Aug 4 Brief

    Ottawa's major-project reform file remains unresolved until the promised What We Heard report shows how rights-holder objections were recorded.

    On: No new Indigenous ownership closing crossed the public tape; the live signal was operating capacity around finance standards, procurement access, land-use planning and critical-mineral approval clocks.
  174. open 3 weeks · first raised Aug 4 Brief

    The final issued core documents, any transition timeline and the first Nations adopting under the new standards were not visible on the public page during this run.

    On: FMB's modern-treaty standards move from consultation to operating infrastructure
  175. open 3 weeks · first raised Aug 4 Brief

    The public event page does not disclose adoption numbers, verified supplier counts, procurement values or whether governments and corporates will treat the verification data as authoritative.

    On: Ontario EDOs get a procurement-verification lane, not a contract award
  176. open 3 weeks · first raised Aug 4 Brief

    The public index does not show the submissions received, Nation-by-Nation positions, draft plan text or how economic-development trade-offs will be resolved.

    On: Two B.C. planning clocks close today: Kaska land use and Meziadin salmon habitat
  177. open 3 weeks · first raised Aug 5 Brief

    A final, Nation-issued damage assessment, insured-loss estimate, rebuilding budget and federal/provincial recovery package were not public during this run.

    On: Okanagan Indian Band's wildfire file becomes a rebuilding and infrastructure bill
  178. open 3 weeks · first raised Aug 5 Brief

    Okanagan Indian Band wildfire recovery should now be carried as an active rebuilding file until damage totals, public recovery funding and service-restoration timelines are public.

    On: No new Indigenous ownership closing crossed the tape; the live signal was recovery capacity, utility infrastructure, Nation-to-province priorities and Indigenous tourism enterprise.
  179. open 3 weeks · first raised Aug 5 Brief

    The article does not disclose revenue, margins, ownership structure, booking volume or how many workers will convert from grounds crew into certified pilots.

    On: Indigenous Tourism Ontario is turning drone shows into a cultural-tourism product and workforce lane
  180. open 3 weeks · first raised Aug 5 Brief

    The public report did not disclose total repair cost, whether additional capital upgrades are required, or how the Hamlet of Gjoa Haven and Nunavut will reduce recurrence risk.

    On: Gjoa Haven's boil-water advisory is lifted, but the infrastructure lag remains the story
  181. open 3 weeks · first raised Aug 5 Brief

    The release does not announce a funding commitment, road-work schedule, project list or new agreement with B.C.

    On: Nisga'a Lisims Government puts economy, Highway 113 and wildfire readiness on the B.C. table
  182. open 3 weeks · first raised Aug 7 Brief

    Bill C-21, the Red River Métis self-government treaty legislation, sits short of second reading until Parliament returns, with First Nations calls to withdraw or amend it unresolved.

    On: A fire at nk̓maplqs, and the first test of Canada's fast-track law — a week where both loss and leverage landed on Nations' territory
  183. open 3 weeks · first raised Aug 7 Brief

    Okanagan Indian Band's damage count remains preliminary; the Bradley Creek fire was still out of control past 2,800 hectares as of August 6, and the shape of rebuild support for on-reserve housing is not yet defined.

    On: A fire at nk̓maplqs, and the first test of Canada's fast-track law — a week where both loss and leverage landed on Nations' territory
  184. open 3 weeks · first raised Aug 7 Brief

    The West Coast pipeline comment period closes September 18, with a listing decision targeted for October 1 — and still no published detail on how consultation with the estimated 90-125 affected Indigenous groups fits inside that window, or what the promised equity stake looks like.

    On: A fire at nk̓maplqs, and the first test of Canada's fast-track law — a week where both loss and leverage landed on Nations' territory
  185. open 17 days · first raised Aug 11 Brief

    A final Nation-issued damage assessment, insured-loss estimate, rebuilding budget and public recovery package were not available during this run.

    On: Okanagan Indian Band starts the return-home phase, but the rebuild file is still open
  186. open 17 days · first raised Aug 11 Brief

    No public source reviewed in this run disclosed the event budget, vendor roster, government commitments or any new agreement tied to the commemoration.

    On: Poundmaker Cree Nation puts Treaty 6's 150th anniversary into public governance memory
  187. open 17 days · first raised Aug 11 Brief

    The confirmed public agenda does not yet name the panel topics, business commitments, sponsors' procurement intentions or any financing attached to the entrepreneurship stream.

    On: Kivalliq's trade-show calendar is really a regional capital-access calendar
  188. open 17 days · first raised Aug 11 Brief

    The final agreement, Indigenous submissions and any changes made after the comment period were not public during this run.

    On: Quebec's one-project-one-review comment window closes with rights obligations still in the fine print
  189. open 17 days · first raised Aug 11 Brief

    The public record does not yet show the submissions, the final strategy, funding commitments or whether the Aamjiwnaang pilot becomes a repeatable model.

    On: Environmental-justice consultation moves from input to drafting
  190. open 16 days · first raised Aug 12 Brief

    No new public funding package, statutory amendment, implementation timetable or committee report was verified during this run.

    On: Yukon's child-welfare audit remains a budget and governance file
  191. open 16 days · first raised Aug 12 Brief

    No public source reviewed in this run disclosed Canadian delegate lists, signed contracts, financing, procurement commitments or post-event business outcomes.

    On: Connect 2026 turns supplier diversity into an international procurement lane
  192. open 16 days · first raised Aug 12 Brief

    The public bid page did not disclose the budget, evaluation criteria, preferred supplier, Indigenous-business requirements or whether an Indigenous-led proponent will receive the work.

    On: Saanich's Indigenous learning RFQ closes without a named supplier yet
  193. open 15 days · first raised Aug 13 Brief

    OFNEDA did not publicly disclose attendees, community-specific topics, decisions, project leads or follow-on commitments from the August 12 meeting.

    On: Ontario EDOs met in a quiet operating-capacity lane
  194. open 15 days · first raised Aug 13 Brief

    The public page does not disclose the B.C. funding queue, the Indigenous project pipeline, or how PacifiCan will assess the case for up to 100% contribution levels.

    On: B.C.'s smaller infrastructure lane remains open after the national deadline
  195. open 15 days · first raised Aug 13 Brief

    The public record does not yet show how many Indigenous or territorial applications were submitted, which projects were shortlisted, what dollar amounts were requested, or when contribution agreements will be announced.

    On: The national infrastructure fund moved from Indigenous intake to selection
  196. open 15 days · first raised Aug 13 Brief

    The republished feature does not disclose a new capital request, a new federal or Nunatsiavut funding decision, or updated cost estimates for permafrost-related infrastructure damage in Nunainguk.

    On: Nunainguk turns permafrost thaw into an infrastructure-cost story
  197. open 14 days · first raised Aug 14 Brief

    Sturgeon Lake Cree Nation's judicial review of the Wonder Valley water licence now heads to a December 2026 merits hearing, having survived O'Leary Digital's attempt to block it — the first close look at consultation duties on water permits for the AI buildout.

    On: A community counts what the fire took, while the consultation question moves into courtrooms and comment periods — from the Smoky River to the Ring of Fire
  198. open 11 days · first raised Aug 17 Brief

    Long-term restoration funding, compensation mechanics after the Kirby settlement, DFO licensing rules for use or sale of removed crabs, and measurable clam-bed recovery timelines remain unresolved in the public record reviewed.

    On: Híɫzaqv restoration has moved from spill response to a multi-year operating bill
  199. open 11 days · first raised Aug 17 Brief

    No public source reviewed connects either by-election to a new project approval, financing decision, equity transaction or change in existing agreements.

    On: B.C. governance calendars are moving in major-project territories
  200. open 11 days · first raised Aug 17 Brief

    Sturgeon Lake Cree Nation / Wonder Valley AI data centre remains unresolved. The August 17 digest surfaced an APTN report saying O'Leary Digital's application to quash the Nation's judicial-review request was dismissed, but APTN was Cloudflare-blocked and no public court record or second report was located in-run.

    On: No verified ownership closing crossed the weekend tape; the live signal was route control, consent architecture and restoration economics.
  201. open 11 days · first raised Aug 17 Brief

    The foundation agreement text, exact land-use mechanics, fiscal terms, service commitments and any limits on provincial statutory decision-making were not in the public record reviewed.

    On: Tahltan pushes the foundation-agreement debate back toward facts and investment certainty
  202. open 11 days · first raised Aug 17 Brief

    The IAAC active-assessment page shows several Indigenous community infrastructure comment windows still open, including Fisher River Cree Nation permanent diking, Peguis First Nation interim flood protection, Frog Lake Cree Nation water service and Pekuakamiulnuatsh Takuhikan's South Amishk development; promote only if a determination, funding decision or material filing appears.

    On: No verified ownership closing crossed the weekend tape; the live signal was route control, consent architecture and restoration economics.
  203. open 11 days · first raised Aug 17 Brief

    The public record reviewed does not disclose a final route, final capital cost, financing structure, ownership model, procurement set-asides, mitigation package, regulatory application or federal listing decision.

    On: The Arctic corridor now has an Indigenous-led route frame, not a final route
  204. open 10 days · first raised Aug 18 Brief

    B.C.'s chief gold commissioner did not respond to CBC, and the public record reviewed does not show whether B.C. will approve interim measures, a no-registration reserve, a land-use planning table or a claim buyout.

    On: Lower Similkameen Indian Band is pressing B.C. to pause new Ashnola mining claims
  205. open 10 days · first raised Aug 18 Brief

    CanLII access: First Peoples Law lists Sturgeon Lake Cree Nation v Alberta (Minister of Indigenous Relations), 2026 ABKB 569, but CanLII returned 403 bot protection in-run. The Wonder Valley item therefore rests on The Energy Mix report plus First Peoples Law's court-file index, not direct court-text extraction.

    On: No new ownership closing crossed Monday's tape; the signal was legal process, access to water, food-security procurement and B.C. mineral-tenure pressure.
  206. open 10 days · first raised Aug 18 Brief

    Gitxaała / Declaration Act: B.C.'s Supreme Court factum was due August 17 according to the watchlist; promote only if the filed argument becomes publicly available and is read.

    On: No new ownership closing crossed Monday's tape; the signal was legal process, access to water, food-security procurement and B.C. mineral-tenure pressure.
  207. open 10 days · first raised Aug 18 Brief

    Quebec-Newfoundland and Labrador energy: the digest surfaced an August 17 APTN story, but APTN was Cloudflare-blocked and no fresh public primary source for a new August 17 agreement was located in-run. Do not promote until a current government, utility, Nation or independently readable report is available.

    On: No new ownership closing crossed Monday's tape; the signal was legal process, access to water, food-security procurement and B.C. mineral-tenure pressure.
  208. open 10 days · first raised Aug 18 Brief

    The federal motion record, Ontario's position, the exact lands at issue, valuation evidence and the eventual remedy remain unresolved in the public record reviewed.

    On: Saugeen Ojibway Nation is fighting to keep land return on the remedies table
  209. open 10 days · first raised Aug 18 Brief

    The merits of the judicial review have not been decided. The public record reviewed does not settle consultation adequacy, project financing, final water access, power supply, environmental assessment requirements, Indigenous benefit terms or construction timing.

    On: Sturgeon Lake Cree Nation's Wonder Valley water-permit challenge is moving toward a hearing
  210. open 10 days · first raised Aug 18 Brief

    The public notice does not disclose Arctic Fresh's contract share, intellectual-property rights, future prototype funding, operating economics for Nunavut communities or whether a later procurement will be Inuit-led.

    On: A small CSA contract puts Inuit knowledge and a Nunavut enterprise into controlled-environment agriculture design
  211. open 9 days · first raised Aug 19 Brief

    Canadian Human Rights Tribunal / First Nations child welfare: hold the panelist-request item until a CHRT record, Caring Society note, AFN note or readable independent report can be fetched and read.

    On: No new verified ownership closing crossed Tuesday's tape; the material signal was reclamation governance at Ekati and B.C. community-capital planning.
  212. open 9 days · first raised Aug 19 Brief

    Churchill Falls / Innu rights: hold the August 18 APTN item until a readable ITUM, Matimekush-Lac John, court, provincial, utility or independent report is available. The older ITUM position remains relevant background, but it is not a fresh August 18 source.

    On: No new verified ownership closing crossed Tuesday's tape; the material signal was reclamation governance at Ekati and B.C. community-capital planning.
  213. open 9 days · first raised Aug 19 Brief

    Ekati closure: keep this active until the regulator meeting, enforcement posture, missing monitoring-data issue and closure-security sufficiency are clearer.

    On: No new verified ownership closing crossed Tuesday's tape; the material signal was reclamation governance at Ekati and B.C. community-capital planning.
  214. open 9 days · first raised Aug 19 Brief

    Gitxaała / Declaration Act, Build Communities Strong Fund selection, Tilbury LNG, Crawford nickel, LNG Canada Phase 2 / MNT, Ksi Lisims LNG, Roberts Bank Terminal 2, Cowichan Tribes title appeal, Baffinland / Mary River and B.C.'s First Nations Equity Financing Program remain unresolved from prior editions.

    On: No new verified ownership closing crossed Tuesday's tape; the material signal was reclamation governance at Ekati and B.C. community-capital planning.
  215. open 9 days · first raised Aug 19 Brief

    The public page does not disclose Gitsegukla's dollar allocation from the settlement, the investment policy for proceeds, project-level budgets, timing for housing or infrastructure work, or whether any external financing will be layered onto the settlement-funded plan.

    On: Gitsegukla is turning settlement proceeds and planning into a local budget discipline
  216. open 9 days · first raised Aug 19 Brief

    The public record reviewed does not yet show the result of the requested minister-board meeting, whether enforcement or suspension proceedings will follow, the amount of emulsion disposed, whether the 2025 AEMP data can be recovered, or whether the posted security will fully cover final closure.

    On: Ekati's receiver is now a reclamation-governance test, not only an insolvency file
  217. open 8 days · first raised Aug 20 Brief

    Brantford / Six Nations of the Grand River MOU surfaced through a municipal-news aggregator, but no primary City of Brantford or Six Nations public source was located in-run, so it was not promoted.

    On: No new verified ownership closing crossed Wednesday's tape; the useful signal was trade exposure, procurement access, fishery access and B.C. tourism stewardship.
  218. open 8 days · first raised Aug 20 Brief

    Canadian Human Rights Tribunal / First Nations child welfare remains held until a CHRT record, Caring Society note, AFN note or readable independent report can be fetched and read.

    On: No new verified ownership closing crossed Wednesday's tape; the useful signal was trade exposure, procurement access, fishery access and B.C. tourism stewardship.
  219. open 8 days · first raised Aug 20 Brief

    Churchill Falls / Innu rights remains held. The August 18 APTN item from yesterday's digest was not independently verified in-run, and no fresh readable Nation, court, provincial, utility or independent source crossed today's review.

    On: No new verified ownership closing crossed Wednesday's tape; the useful signal was trade exposure, procurement access, fishery access and B.C. tourism stewardship.
  220. open 8 days · first raised Aug 20 Brief

    The notice does not disclose actual FSC harvest by Nation or area, final catch against available allocations, post-August 19 retention settings, or whether in-river and marine conditions will change the next opening.

    On: Southern B.C. FSC sockeye access ran through Wednesday night
  221. open 8 days · first raised Aug 20 Brief

    The posted public record reviewed does not disclose the number of bidders, the successful supplier, the final award value, task-authorisation volume or whether the full 24-month term will be used.

    On: A federal IT services set-aside closed as a real supplier-access gate
  222. open 8 days · first raised Aug 20 Brief

    The public record reviewed does not disclose the funding model for repeat clam-garden work, how tourism businesses will be measured against the stewardship plan, whether visitor fees flow directly to Tribal Park or restoration budgets, or how restoration outcomes will be reported.

    On: Tofino's visitor economy is being asked to put labour into restoration
  223. open 8 days · first raised Aug 20 Brief

    The public record reviewed does not quantify Indigenous-business exposure by sector, region or product line, and does not show how many firms will seek federal, provincial or CCIB-supported tariff assistance.

    On: The tariff clock is now live for Indigenous exporters, not only for Ottawa
  224. open 7 days · first raised Aug 21 Brief

    MNBC's presidential by-election closes August 22 at 8 p.m.; results among the four candidates — Michael Dumont, Tony Goulet, Kyle Mitton and Anthony Wingham — are expected once voting ends. Meanwhile the KSM 'substantial start' determination heads back for reconsideration after Tsetsaut Skii km Lax Ha's 90-day submission window, now without Gitxsan support behind the mine.

    On: A parole decision reopens a wound Thunder Bay never closed, while First Nations move from minority stakes to majority control — from Baie-Comeau to the Golden Triangle
  225. open 4 days · first raised Aug 24 Brief

    Churchill Falls / Innu rights and the Canadian Human Rights Tribunal / First Nations child-welfare files remain held until readable primary, tribunal or independent records surface.

    On: The weekend did not close a major Indigenous equity transaction; the signal was corridor feasibility, local enterprise, emergency capacity and jurisdiction.
  226. open 4 days · first raised Aug 24 Brief

    KSM substantial-start reconsideration remains active after Tsetsaut Skii km Lax Ha's 90-day submission window and Gitxsan Huwilp Government's withdrawal of support; no new reconsideration decision crossed the weekend tape.

    On: The weekend did not close a major Indigenous equity transaction; the signal was corridor feasibility, local enterprise, emergency capacity and jurisdiction.
  227. open 4 days · first raised Aug 24 Brief

    MNBC presidential by-election: voting closed August 22 at 8 p.m. PT, but no official result was located in the public record reviewed for this edition. Carry until MNBC or OneFeather publishes the result.

    On: The weekend did not close a major Indigenous equity transaction; the signal was corridor feasibility, local enterprise, emergency capacity and jurisdiction.
  228. open 4 days · first raised Aug 24 Brief

    The public article does not identify which Anishinabek First Nations will next enact or revise citizenship laws, what Canada will recognize administratively, or what fiscal and land resources would follow recognition.

    On: Anishinabek citizenship law work keeps membership tied to land and fiscal capacity
  229. open 4 days · first raised Aug 24 Brief

    The public record does not show a final investment case, capital stack, environmental-assessment path, Rights Holder consultation record, winter route design, market-sounding results or committed test-voyage schedule.

    On: Churchill's year-round shipping case is now a technical file, not just a political slogan
  230. open 4 days · first raised Aug 24 Brief

    The public record reviewed does not show whether B.C. or Yukon will deploy Yukon First Nations Wildfire crews this season, whether Type 1 certification rules will change, or how much emergency-response spending has gone to Indigenous-led crews.

    On: B.C.'s wildfire emergency is now a First Nation authority and supplier-capacity file
  231. open 4 days · first raised Aug 24 Brief

    The public sources reviewed do not disclose the final operating budget for the greenhouse and compost stream, permanent job count, commercial biochar offtake terms, final environmental determination or whether the 2026 construction target for the Awasis Organics facility will hold.

    On: Cowessess is turning waste, food and jobs into one operating model
  232. open 4 days · first raised Aug 24 Brief

    The weekend ceremony did not itself announce a settlement, fiscal agreement, land return, education funding change or formal response to Alberta's referendum dispute.

    On: Treaty 6's 150th anniversary put the Crown relationship back on the weekend calendar
  233. open 3 days · first raised Aug 25 Brief

    Lac Simon / Novador remains an active consent and court-risk file; the August 24 digest surfaced a fresh APTN item, but no new readable court decision or regulator order was located in-run.

    On: Monday did not close an Indigenous ownership transaction; it exposed where trade, procurement, housing and governance systems now have to do real work.
  234. open 3 days · first raised Aug 25 Brief

    No public source reviewed for this edition identifies an Indigenous procurement target, Inuit or First Nations partnership, northern training stream, community-benefit agreement or route-specific resupply plan attached to the award.

    On: Ottawa's icebreaker award is an Arctic trade-capacity file, but not an Indigenous ownership file
  235. open 3 days · first raised Aug 25 Brief

    The public OneFeather result page had not yet displayed the certified count declaration in the accessible record reviewed for this edition, and MNBC had not yet published a fuller post-swearing-in statement on its main election site.

    On: MNBC says Anthony Wingham has been declared president-elect, while the public count page still lags
  236. open 3 days · first raised Aug 25 Brief

    The public record does not yet show the Indigenous-business share of the federal support package, how CCIB support will be funded, which firms are most exposed by product code, or whether exemptions and tariff-relief processes will be usable by small exporters.

    On: Tariffs are now an Indigenous small-business liquidity file
  237. open 3 days · first raised Aug 25 Brief

    The report is a recommendation document, not an appropriation. It does not itself allocate capital, create the fire institution, settle the insurance design or bind provinces and Canada to a tripartite governance model.

    On: The wildfire report turns displacement into an infrastructure and insurance bill
  238. open 2 days · first raised Aug 26 Brief

    Great Bear Sea PFP remains a long-current conservation-finance model after its August 25 Fulbright Canada recognition, but the recognition itself was not treated as a new financing or approval event.

    On: Tuesday moved from exposure to instruments: treaty compensation, signed project terms, hatchery contracts, Nation-led monitoring and distinct Métis tariff asks.
  239. open 2 days · first raised Aug 26 Brief

    Lac Simon / Novador remains an active consent and court-risk file; no new readable court decision or regulator order was located in this run.

    On: Tuesday moved from exposure to instruments: treaty compensation, signed project terms, hatchery contracts, Nation-led monitoring and distinct Métis tariff asks.
  240. open 2 days · first raised Aug 26 Brief

    The agreement itself was not public in the sources reviewed, so the scale of financial benefits, equity economics, veto or dispute provisions, implementation budget and monitoring authority remain undisclosed.

    On: Slate Falls Nation signs final Springpole project agreement with First Mining
  241. open 2 days · first raised Aug 26 Brief

    The federal support package does not yet show a dedicated Métis stream, Indigenous-business allocation, application pathway through Métis governments, or reporting metric for who receives liquidity and diversification support.

    On: Métis National Council makes tariff relief a distinctions-based economic file
  242. open 2 days · first raised Aug 26 Brief

    The public record reviewed for this edition does not show the ratification terms, distribution formulas, trust structures, investment policy, tax treatment or timing of member payments for either Nation.

    On: Treaty agricultural-benefits settlements move $209.5 million into Nation capital decisions
  243. open 2 days · first raised Aug 26 Brief

    The release says the checkpoint is not intended to interfere with lawful travel or responsible industrial activity, but public sources reviewed for this edition do not yet show company responses, regulator guidance, enforcement protocols or whether the data gathered will be reported publicly.

    On: Clearwater River Dene Nation turns uranium-road monitoring into a live checkpoint
  244. open 2 days · first raised Aug 26 Brief

    The three releases do not disclose all Indigenous subcontract values, long-term operating budgets, shared-governance terms, or how future Phase 2 Pacific Salmon Strategy Initiative funding will be allocated.

    On: B.C. salmon hatchery contracts put First Nation operation and co-management into infrastructure delivery
  245. open 1 day · first raised Aug 27 Brief

    Baker Lake fuel spill: the official spill record shows 200 litres of petroleum fuel from a marine vessel affecting 1,500 square metres of Baker Lake on August 25; Nunatsiaq News reported a temporary water-treatment shutdown and restored drinking-water access, but Coast Guard and Nunavut infrastructure responses were still pending in the article reviewed.

    On: Wednesday's signal was operating architecture: Tahltan land-use talks, Nation-owned energy capital, shale-gas consultation risk, shelter procurement and labour-market evidence.
  246. open 1 day · first raised Aug 27 Brief

    Lac Simon / Novador, KSM substantial-start reconsideration, Gitxaała / Declaration Act, Tilbury LNG, Crawford nickel, LNG Canada Phase 2 / MNT, Ksi Lisims LNG, Roberts Bank Terminal 2, Cowichan Tribes title appeal, Baffinland / Mary River and the B.C. First Nations Equity Financing Program remain unresolved from prior editions.

    On: Wednesday's signal was operating architecture: Tahltan land-use talks, Nation-owned energy capital, shale-gas consultation risk, shelter procurement and labour-market evidence.
  247. open 1 day · first raised Aug 27 Brief

    Marten Falls Community Access Road and the broader Ring of Fire road network remain active decision-clock files; no new August 26 final approval was verified for this edition.

    On: Wednesday's signal was operating architecture: Tahltan land-use talks, Nation-owned energy capital, shale-gas consultation risk, shelter procurement and labour-market evidence.
  248. open 1 day · first raised Aug 27 Brief

    The draft foundation-agreement text, benefit-sharing mechanics, title and jurisdiction language, overlapping First Nations positions, tenure-holder concerns and federal participation terms were not public in the sources reviewed.

    On: Tahltan and B.C. move foundation-agreement talks into public engagement
  249. open 1 day · first raised Aug 27 Brief

    The extension value, final approval documents, service-model changes, future operator criteria, location options and First Nations role in procurement design were not public in the sources reviewed.

    On: Yukon First Nations and territorial leaders extend 405 Alexander operating stability
  250. open 1 day · first raised Aug 27 Brief

    The public record reviewed does not yet show the working group's membership, mandate, resources, meeting records, consultation protocol, project-specific implications or whether any First Nation supports a change to the moratorium.

    On: New Brunswick reopens shale-gas review with First Nations rights in the terms of reference
  251. open 1 day · first raised Aug 27 Brief

    The release does not disclose repayment terms, expected production volumes, reserve-life assumptions, environmental conditions, procurement commitments, counterparties or the Nation's capital-allocation plan for future revenues.

    On: Ottawa backs Cold Lake First Nations' Etthen Energy with repayable capital
  252. open 1 day · first raised Aug 27 Brief

    The study does not answer whether on-reserve youth face the same pattern, how Nation-led training or local employment programs change outcomes, or which interventions reduce long-term disconnection.

    On: Statistics Canada labour-market study flags First Nations youth risk while excluding on-reserve youth
  253. raised in the latest edition · first raised Aug 28 Brief

    The KSM 'substantial start' determination remains under court-ordered reconsideration following Tsetsaut Skii km Lax Ha's submission window — now with the Gitxsan Huwilp Government's 2013 support letter formally withdrawn — while Canada's argument that land return is 'not an available remedy' in Saugeen Ojibway Nation's Treaty 45½ case goes to a Toronto hearing October 2.

    On: A table Canada has never set: First Nations leadership will sit across from the Prime Minister and every premier on October 26 — while BC's DRIPA fight reopens by petition and Ottawa settles $209.5 million in broken agricultural promises

What this page does not claim

A question leaving this register means the source material stopped carrying it. That is weaker than an answer. Sometimes a question is dropped because it was resolved; sometimes attention simply moved on. Where something has genuinely been settled, the ledger record is the place that says so, and its stage will have moved.

Nothing here is a claim that an answer is being withheld. Most of these are open for the ordinary reason that commercial terms are private, regulatory processes take time, and courts are slow.